Expansion works of the Border Gate Checkpoint in Macau

Methods: Wire saw cutting and remote robot Brokk 330 with hydraulic breaker

Project highlight: Demolition of main inspection building and concrete structure at the vehicle lanes

Adopting wire saw cutting method to demolish approximately 1,900 m3 of concrete structure

Using scaffoldings to secure the targets needed to be demolished

Introducing remote robot Brokk 90 parts before carted away